
Renewal fees for industrial designs in Kazakhstan must be paid by certain dates. In this section you will find a description of how these renewal due dates are calculated, both the very first renewal due date and all subsequent renewal due dates.
No annuities are due throughout the application process. The first renewal is paid 2 months after the grant date to the National Institute of Intellectual Property (Kazpatent). This payment must cover all annuities that would have been due throughout the application process.
For example, if the grant date is 2022-01-20, then the first renewal must be paid by 2022-03-20.
After the first renewal has been paid, all subsequent annuities must be paid annually on the anniversary of the filing date. The due date should be the month and date corresponding to the filing date.
For example, if the filing date was on November 9, then all subsequent annuities will be due on November 9 each year.
In Kazakhstan, industrial designs are just one form of intellectual property. Other important IP rights include patents and trademarks. Explore our patent and trademark renewal pages for country-specific guidance and official fee information.
If you need any help renewing industrial designs, patents or trademarks and are looking for a cost-efficient solution, get in touch with us.

There are no annuities due in Kazakhstan before the patent is granted. Once the patent has been granted, annuities must be paid in accordance with the renewal interval described above under the section Due Dates.

The renewal fee in Kazakhstan can be paid up to 12 months before the renewal due date. It is important to note that the renewal fee cannot be paid earlier than this. Any payments made before the opening of the payment window will result in the payment being rejected.

Yes, it is possible to renew a Kazakh industrial design after its renewal due date. If you fail to pay the renewal fee before the due date, a grace period of 6 months is given wherein the renewal fees can still be settled. When entering the grace period you will incur a surcharge fee to be settled along with the renewal fee. If you wish to maintain the industrial design, both the renewal fee and the surcharge fee will have to be settled. For example, if an industrial design has a renewal due date of 2021-05-31 and the due date is missed, the industrial design will enter the grace period from 2021-06-01. After this point both the renewal fee and the surcharge fee will need to be settled by 2021-11-30. Failure to pay these fees before the surcharge due date will result in the industrial design lapsing.

An industrial design will stay in force for 25 years in Kazakhstan from the filing date if successfully renewed. Failure to pay the renewal fees will result in the industrial design lapsing.


.avif)


.avif)