Design renewal fees in Sweden: costs, due dates and grace period
A registered design in Sweden lasts up to 25 years from the filing date. The first renewal falls due before the end of year 5, and renewals then run every 5 years. Miss one and you have 6 months to put it right, with a SEK 500 surcharge.
What are the design renewal due dates in Sweden?
Sweden protects a registered design for up to 25 years from the filing date. Renewal falls due every 5 years, 4 times in all.
The first renewal falls due before the end of year 5, payable to PRV. It carries the design into year 6.
For example, if the filing date is 2015-03-15, the first renewal is due by 2020-03-15.
Each further renewal runs every 5 years on the same basis, until the 25-year maximum is reached. There is no extension beyond it.
For example, protection can be kept alive until 2040-03-15, after which no further renewal is possible.
Sweden is not a member of the Hague System. There is no international design route into Sweden: a design must be registered directly with PRV, and every renewal fee is paid to PRV rather than to WIPO.
A design registered here can be kept alive for at most 25 years. The first renewal falls due on 15 Mar 2020, and renewals then run every 5 years, 4 in total. Miss one and you have 6 months to put it right with a surcharge, until 15 Sep 2020 in this example.
Official design renewal fees by year in Sweden
Official fees payable to PRV, in SEK. Renewal falls due every 5 years, 4 times in all, to keep the design alive for the full 25 years.
| Renewal | Official fee (SEK) | Cumulative (SEK) |
|---|---|---|
| Year 6 | 2 500 | 2,500 |
| Year 11 | 2 500 | 5,000 |
| Year 16 | 2 500 | 7,500 |
| Year 21 | 2 500 | 10,000 |
| Full term, years 6 to 25 | 10,000 | |
Save up to 50% on your design renewals
The official fees are fixed. What your provider adds on top is not. Send your email and we'll show you what these renewals should really cost.
Missed a design renewal deadline in Sweden?
A six-month grace period runs from the expiry date. You can still renew inside it, with a surcharge of SEK 500. The SEK 2,500 renewal fee is the e-filing rate; renewing by other means costs SEK 3,000. Once the grace period closes, the design lapses.
If the renewal due on 15 Mar 2020 is missed, the design stays recoverable for 6 months, until about 15 Sep 2020 in this example.
Design renewal fees in other jurisdictions
The same schedule, deadlines and grace rules, in the jurisdictions we are asked about most.
Looking for a different jurisdiction?
Design renewal fees and deadlines in every jurisdiction we cover.
Other IP renewals in Sweden
Designs aren't the only rights that lapse without renewal. Sweden also protects patents and trademarks. Each on its own schedule and fee scale.
Patents
Renewal deadlines, grace periods and official fees for patents in Sweden.
Trademarks
What happens to a Swedish design before it has been registered?
Renewal fees must be paid in Sweden regardless of whether the design is registered or not. You can find the rules for calculating the renewal due dates above in the Due Dates section.
When can I pay the renewal fee in Sweden?
The renewal fee in Sweden can be paid up to 12 months before the renewal due date. It is important to note that the renewal fee cannot be paid earlier than this. Any payments made before the opening of the payment window will result in the payment being rejected.
Can I renew a registered design after I miss a renewal due date?
Yes, it is possible to renew a Swedish registered design after its renewal due date. If you fail to pay the renewal fee before the due date, a grace period of 6 months is given wherein the renewal fees can still be settled. When entering the grace period you will incur a surcharge fee to be settled along with the renewal fee. If you wish to maintain the registered design, both the renewal fee and the surcharge fee will have to be settled. For example, if a registered design has a renewal due date of 2021-05-31 and the due date is missed, the registered design will enter the grace period from 2021-06-01. After this point both the renewal fee and the surcharge fee will need to be settled by 2021-11-30. Failure to pay these fees before the surcharge due date will result in the registered design lapsing.
How long do registered designs last in Sweden?
A registered design will stay in force for 25 years in Sweden from the filing date if successfully renewed. Failure to pay the renewal fees will result in the registered design lapsing.
Design renewal FAQ
Enter the new era of IP renewals


.avif)


.avif)




